Check MANIFEST when PR is created #195
Merged
Travis CI / Travis CI - Pull Request
succeeded
Aug 20, 2024 in 1m 57s
Build Passed
The build passed, just like the previous build.
Details
This is a pull request build.
It is running a build against the merge commit, after merging #195 Check MANIFEST when PR is created .
Any changes that have been made to the master branch before the build ran are also included.
Jobs and Stages
This build has three jobs, running in parallel.
Job | Perl | ENV | OS | State |
---|---|---|---|---|
434.1 | 5.38 | TEST_WITH_NETWORK=1 | Linux | passed |
434.2 | 5.34 | TEST_WITH_NETWORK=1 | Linux | passed |
434.3 | 5.26 | TEST_WITH_NETWORK=1 | Linux | passed |
Build Configuration
Build Option | Setting |
---|---|
Language | Perl |
Operating System | Linux (Focal) |
Perl Versions | 5.38, 5.34, 5.26 |
Build Configuration
{
"language": "perl",
"os": [
"linux"
],
"dist": "focal",
"env": [
"jobs={:TEST_WITH_NETWORK=>\"1\"}"
],
"perl": [
"5.38",
"5.34",
"5.26"
],
"before_install": [
"eval \"$(curl https://travis-perl.github.io/init)\"",
"sudo apt-get install -y libidn2-dev",
"cpan-install --deps Devel::CheckLib Module::Install Module::Install::XSUtil Test::Fatal"
],
"install": [
"cpanm --verbose --notest --configure-args=\"--no-ed25519\" ."
],
"script": [
"prove -bl $(test-files)"
]
}
Loading