Presence engine - states and events #187
run-tests.yml
on: push
Matrix: Integration and Unit tests
Acceptance tests
42s
Tests
0s
Annotations
10 errors
Acceptance tests
The run was canceled by @github-actions[bot].
|
Acceptance tests
Process completed with exit code 1.
|
Integration and Unit tests (3.8.18)
The run was canceled by @github-actions[bot].
|
Integration and Unit tests (3.8.18)
The operation was canceled.
|
Integration and Unit tests (3.11.6)
The run was canceled by @github-actions[bot].
|
Integration and Unit tests (3.11.6)
The operation was canceled.
|
Integration and Unit tests (3.10.13)
The run was canceled by @github-actions[bot].
|
Integration and Unit tests (3.10.13)
The operation was canceled.
|
Integration and Unit tests (3.9.18)
The run was canceled by @github-actions[bot].
|
Integration and Unit tests (3.9.18)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
acceptance-test-reports
Expired
|
61 KB |
|