Skip to content

Fix linter errors

Fix linter errors #110

Triggered via push August 7, 2023 12:04
Status Cancelled
Total duration 2m 23s
Artifacts 1

run-tests.yml

on: push
Matrix: Integration and Unit tests
Acceptance tests
1m 7s
Acceptance tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Integration and Unit tests (3.7.13)
The run was canceled by @github-actions.
Integration and Unit tests (3.7.13)
Process completed with exit code 1.
Integration and Unit tests (3.8.13)
The run was canceled by @github-actions.
Integration and Unit tests (3.8.13)
The operation was canceled.
Integration and Unit tests (3.9.13)
The run was canceled by @github-actions.
Integration and Unit tests (3.9.13)
The operation was canceled.
Integration and Unit tests (3.10.11)
The run was canceled by @github-actions.
Integration and Unit tests (3.10.11)
The operation was canceled.
Integration and Unit tests (3.11.3)
The run was canceled by @github-actions.
Integration and Unit tests (3.11.3)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
acceptance-test-reports Expired
19.6 KB