Bump golang from 1.20.5-bullseye to 1.21.2-bullseye in /cicd #40
Annotations
5 errors
test (ubuntu-latest)
Process completed with exit code 2.
|
test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
test (windows-latest)
The operation was canceled.
|
test (macOS-latest)
The job was canceled because "ubuntu-latest" failed.
|
test (macOS-latest)
The operation was canceled.
|