Specify highlight priority #134
Triggered via pull request
December 5, 2023 13:35
Status
Failure
Total duration
6h 5m 10s
Artifacts
–
ci.yml
on: pull_request
Stack Linux
/
Build
46s
Stack macOS
/
Build
2m 49s
Stack Windows
/
Build
4m 6s
Nix Linux
/
Build Vim plugin
27s
Nix macOS
/
Build Vim plugin
1m 49s
Matrix: Nix Linux / build-package
Matrix: Nix macOS / build-package
Stack Linux
/
Test
3m 46s
Stack macOS
/
Test
19m 22s
Stack Windows
/
Test
25m 5s
Annotations
2 errors and 6 warnings
Nix macOS / Build package (ghc963)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
|
Nix macOS / Build package (ghc963)
The operation was canceled.
|
Stack macOS / Build
Failed to restore: Cache service responded with 429
|
Stack macOS / Test
Failed to restore: Cache service responded with 429
|
Stack macOS / Test
Failed to restore: Cache service responded with 429
|
Stack Windows / Test
Failed to restore: Cache service responded with 429
|
Stack Windows / Test
Failed to restore: Cache service responded with 429
|
Nix macOS / Build package (ghc963)
Runner GitHub Actions 10 did not respond to a cancelation request with 00:05:00.
|