Bump golang.org/x/net from 0.27.0 to 0.31.0 #9631
Triggered via pull request
November 19, 2024 11:40
Status
Failure
Total duration
15m 54s
Artifacts
–
ci.yml
on: pull_request
Lint
3m 25s
Build
1m 47s
Benchmark
9m 40s
Vendor check
1m 28s
Check jsonnet & tempo-mixin
48s
Build technical documentation
19s
Matrix: Run integration tests
Matrix: Run Unit Tests
Annotations
7 errors
Run integration tests (test-e2e-serverless)
Process completed with exit code 2.
|
Run integration tests (test-integration-poller)
The job was canceled because "test-e2e-serverless" failed.
|
Run integration tests (test-integration-poller)
The operation was canceled.
|
Run integration tests (test-e2e-deployments)
The job was canceled because "test-e2e-serverless" failed.
|
Run integration tests (test-e2e-deployments)
The operation was canceled.
|
Run integration tests (test-e2e)
The job was canceled because "test-e2e-serverless" failed.
|
Run integration tests (test-e2e)
The operation was canceled.
|