Skip to content

Bump golang.org/x/sync from 0.7.0 to 0.9.0 #9630

Bump golang.org/x/sync from 0.7.0 to 0.9.0

Bump golang.org/x/sync from 0.7.0 to 0.9.0 #9630

Triggered via pull request November 19, 2024 11:39
Status Failure
Total duration 15m 50s
Artifacts

ci.yml

on: pull_request
Matrix: Run integration tests
Matrix: Run Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run integration tests (test-e2e-serverless)
Process completed with exit code 2.
Run integration tests (test-e2e-deployments)
The job was canceled because "test-e2e-serverless" failed.
Run integration tests (test-e2e-deployments)
The operation was canceled.
Run integration tests (test-e2e)
The job was canceled because "test-e2e-serverless" failed.
Run integration tests (test-e2e)
The operation was canceled.
Run integration tests (test-integration-poller)
The job was canceled because "test-e2e-serverless" failed.
Run integration tests (test-integration-poller)
The operation was canceled.