Update the bolognese gem version in Lupo #495
pull_request.yml
on: pull_request
lint
/
build
48s
Matrix: parallel-test / parallel-test
Annotations
8 errors
lint / build
Process completed with exit code 1.
|
parallel-test / parallel-test (1, 8)
Process completed with exit code 1.
|
parallel-test / parallel-test (4, 8)
The job was canceled because "_1_8" failed.
|
parallel-test / parallel-test (4, 8)
Process completed with exit code 1.
|
parallel-test / parallel-test (2, 8)
The job was canceled because "_1_8" failed.
|
parallel-test / parallel-test (2, 8)
The operation was canceled.
|
parallel-test / parallel-test (7, 8)
The job was canceled because "_1_8" failed.
|
parallel-test / parallel-test (7, 8)
The operation was canceled.
|