Skip to content

Commit

Permalink
Update ProjectStructureAndRoles.md
Browse files Browse the repository at this point in the history
Co-authored-by: Eric Murray <[email protected]>
  • Loading branch information
hdamker and eric-murray authored Jun 20, 2024
1 parent 2460ea0 commit 6c06158
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion ProjectStructureAndRoles.md
Original file line number Diff line number Diff line change
Expand Up @@ -61,7 +61,7 @@ More details can be found in the [CONTRIBUTING.MD](https://github.com/camaraproj

**API Backlog**

The API Backlog Working Group is supervised by the TSC. The responsibility of the Working Group is to coordinate and prepare all the material needed to evaluate a proposal for a new API, API family (Sub Project) or scope change of a Sub Project. The prepared material will be evaluated by TSC to decide if a new Sub Project should be onboarded in CAMARA.
The API Backlog Working Group is supervised by the TSC. The responsibility of the Working Group is to coordinate and prepare all the material needed to evaluate a proposal for a new Sub Project (consisting of one or more related APIs), or scope change of an existing Sub Project (including adding additional APIs to that Sub Project). The prepared material will be evaluated by TSC to decide if a new Sub Project should be onboarded in CAMARA.

The API onboarding and management in CAMARA is described in [API-onboarding.md](./documentation/API-onboarding.md).

Expand Down

0 comments on commit 6c06158

Please sign in to comment.