Skip to content

Commit

Permalink
Update README.md
Browse files Browse the repository at this point in the history
  • Loading branch information
pavly-gerges authored Sep 22, 2024
1 parent aedecaa commit dff1473
Showing 1 changed file with 3 additions and 2 deletions.
5 changes: 3 additions & 2 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -80,8 +80,9 @@ timeline
title The Electrostatic-Sandbox SDK Milestones
2024-2025 (Tight Period): Primer version 1.0.0 (v1.0.0-p1): Migration of supportive projects: Std Libraries: OS Resources Control
2025-2026 (Proof-of-concept Period): Intermediary period for testing and prototyping simulation projects
2025-2026 (Production Period): Stable version v1.0.0: Base IEEE-1516 HLA API and RTI integration for distributed simulation building
2026-.... (Open Period): Open period for: testing,: prototyping simulation projects,: communicating with contemplated teams,: and publications on JOSS
2025-2026 (Production Period): Software & Networking Infrastructure: Stable version v1.0.0
2026-2028 (Production Period): Simulation Infrastructure: Base IEEE-1516 HLA API and RTI integration for distributed simulation building: Stable version v2.0.0
2028-.... (Open Period): Open period for: testing,: prototyping simulation projects,: communicating with contemplated teams,: and publications on JOSS
```
> [!IMPORTANT]
> **Migration Milestones:**
Expand Down

0 comments on commit dff1473

Please sign in to comment.